MPHS/SH/K/123/2025
KERJA MEMBEKAL DAN MEMASANG LAMPU JALAN INTEGRATED SOLAR LED DI JALAN ZURAH 4,5,6 PERINDUSTRIAN ZURAH, RASA UNTUK MAJLIS PERBANDARAN HULU SELANGOR.
| Nama Syarikat | ERFOLG ENGINEERING |
|---|---|
| Tempoh Siap | 6 Minggu |
| Harga Tawaran | RM 147,188.00 |